DES clients don't talk about efficiency improvements in percentages. They talk about millions of dollars per year - because that's what autonomous process control delivers at industrial scale. Every result below is documented, verified, and still accumulating.

$
Monthly Savings - Pulp Mill, Western Canada
$
Daily Gas Savings - Electric Utility, Alberta
$
Annual Energy Savings - Oil Sands, Canada
0
Reduction in Total Pulp Production Costs
Case Results

Four Facilities. Four Stories Worth Reading.

These are not projections built from models. They are not estimates from audits. They are the actual, measured financial results generated by DES technology currently operating at client facilities across North America - results that continue to accumulate every day.

Western Canada - Pulp & Paper

Major Pulp Mill - EMRS Deployment

$560K
per month saved

Before DES, this facility was considered well-managed. Experienced operators, modern equipment, professional engineering support. The gap between their actual performance and true optimum was invisible, because it had always been there. It was the baseline.

DES EMRS deployment revealed and closed that gap. Fossil fuel costs fell by over $500,000 per month. Electric power imports decreased by a further $60,000 per month. Total pulp production cost declined by 2.5% - a figure that, at production scale, represents one of the most significant single-source cost reductions in the facility's history.

The facility had not been underperforming by any conventional measure. The conventional measure was simply wrong.

EMRSMultiMaxxPulp & Paper$6.7M+ Annual Impact
Southern United States - Paper Manufacturing

Paper Mill - OptiMaxx RTP Deployment

$50K
per month saved

This facility operated in a real-time pricing environment - meaning every hour, the cost of electricity changed. Every hour, the economically optimal facility configuration changed with it. And every hour, the time available to recognize the shift, calculate the response, and execute the change was measured in minutes.

OptiMaxx eliminated the human bottleneck entirely. Deployed at this paper mill, it reduced electrical costs by $50,000 per month - not by using less power, but by using it when it was cheapest and less of it when it wasn't. The facility's production schedule never changed. Its energy bill did.

The payback period was measured in weeks. The ongoing return is measured in decades.

OptiMaxxReal-Time PricingPaper$600K Annual Impact
Alberta, Canada - Electric Utility

Utility Power Station - EMRS Deployment

$25K
per day saved

An electric utility managing a complex multi-fuel, multi-boiler power station in Alberta. A facility operating in a sophisticated regulatory environment with experienced process control professionals already in place. By any standard, not a facility with obvious optimization upside.

DES EMRS disagreed with that assessment and proved it - generating an average of $25,000 per day in natural gas cost savings from the moment autonomous control was engaged. Annualized, that is over $9 million per year from a facility that already considered itself well-optimized. The gap between "well-optimized" and truly autonomous optimization is consistently larger than clients expect and consistently profitable to close.

EMRSMulti-Fuel BoilersElectric Utility$9M+ Annual Impact
Fort McMurray, Canada - Oil Sands Production

Suncor Base Plant - Advanced Control

$11.2M
per year saved

Synthetic crude oil production at one of Canada's most significant oil sands projects. A facility where energy intensity is extreme, margins are perpetually pressured, and the complexity of simultaneous optimization challenges would defeat any traditional control approach. A facility that needed something fundamentally different.

DES Advanced Control Technologies delivered it - reducing energy costs by $11.2 million per year. A result significant enough that the operations supervisor's response has become the most-quoted line in DES's history. His testimonial is below.

That is the standard DES aspires to at every client facility: a system so capable and reliable that the humans overseeing it can focus on improvement rather than survival.

Advanced ControlOil SandsEMRS$11.2M Annual Impact
The Full Picture

The Financial Results Are the Headline. The Operational Benefits Are the Story.

Every DES deployment generates financial returns that justify the investment many times over. But the operational improvements that accompany those financial results change how a facility functions at a fundamental level and create value that compounds long after the payback period ends.

→

Dramatically Reduced Upset-Related Costs

Process upsets caused by constraint violations cost facilities enormous amounts in maintenance, lost production, and emergency response - costs that rarely appear on any single line item but collectively represent a significant fraction of operating expense. DES's continuous constraint management eliminates most of them. The savings are real. They just don't announce themselves.

→

Product Quality & Pricing Power

Consistent process control produces consistent product. Consistent product commands consistent pricing and often a premium in markets where reliability is valued. DES clients regularly report quality improvements that open pricing opportunities they did not previously have access to. This is not an efficiency story. It is a revenue story.

→

Environmental Compliance Without Effort

Regulatory compliance in an autonomously optimized facility is not a periodic management challenge - it is a continuously enforced constraint. DES systems observe environmental limits every second, without exception, without operator vigilance required. Compliance becomes structural rather than behavioral and the risk of costly violations essentially disappears.

→

A Culture That Pursues Improvement

Perhaps the most durable benefit of a DES deployment is what it does to an operating culture. When the question changes from "How did we do?" to "What prevented us from doing better?" - an organization begins pursuing the next frontier of performance rather than defending the current one. That shift is worth more than any single financial metric.

Audits in Progress

The Pipeline Continues to Grow.

Initial engineering audits have identified significant optimization potential at the following facilities - quantified in financial terms, ahead of any commitment.

Canada · Steel
Canadian Steel Mill

Initial audit completed. Significant potential for energy cost reduction identified across the facility's power generation and steam distribution systems. Quantification in progress.

Canada · Institutional
Large University Campus Powerhouse

Audit indicates substantial savings opportunity in multi-boiler campus steam distribution and electrical demand management. Preliminary findings shared with facilities leadership.

Every DES engagement begins with a free engineering audit that quantifies the specific savings available at your facility, before any commitment is made.

Featured Clients

Organizations That Have Chosen DES

DES technology is operating today at facilities across North America. These organizations have documented the results.

Boise Paper
Boise Paper
Pulp & Paper
Catalyst Paper Corp
Catalyst Paper Corp
Elk Falls Division, BC
TransAlta Corporation
TransAlta Corporation
Alberta Utilities
CNOOC
OPTI Canada
Long Lake, Ft. McMurray
Suncor Energy
Suncor Energy
Oil Sands, Alberta
International Paper
International Paper
Pulp & Paper
DMI
DMI Industries
Pulp & Paper, BC
In Their Own Words

What Clients Say When They're Not in a Marketing Meeting.

"

Frank Slater - Former Utilities Superintendent, Catalyst Paper Corp

"As always, you and your team of 'energy geniuses' set the standard that others fail to meet. Any facility that fails to embrace DES remarkable technology would be remiss in their operational reliability and energy reduction objectives."

"

Frank Slater - Former Utilities Superintendent, Catalyst Paper Corp

"In the very near future in North America there will be two kinds of mills: those that embrace DES technology and those that are no longer in business."

"

Hans Brauer - Operations Supervisor, OPTI Canada – Long Lake Project  |  Ft. McMurray, Alberta

"I guess I'll have to start bringing in a paperback." The most honest performance review a control system has ever received, and the one DES is most proud of. When operators have nothing to do, the system is working.

"

Process Control Manager, Alberta

"DES is truly the leader not only in Closed Loop energy management but Process Optimization as well. In addition to their outstanding control solutions, DES truly understands the process and how to apply the technology. The benefit exceeds anything that we had previously envisioned as possible."

Your Facility Is Next

Every One of These Results Began With a Single Conversation.

Contact our engineering team for a free preliminary evaluation. We will identify your specific optimization opportunities, quantify them in documented financial terms, and show you exactly what autonomous process control can change at your facility, before you commit anything.